MSG-VL171 Status of inspection lot 050000000010 / partial lot 000000 does not allow good issue

former_member184536
Active Contributor
0 Kudos

Dear QM Gurus

I m doingn Customer Reutrn Scenario.

I  have done following things

1)Assign delivery type LR  to lot origin 05

2) Assign movement type 655 to DN Schecule line Category

3) Assign inspection type 05 to that materail.

4) Inspection plan has been created.

I want stock relevant inspection lot that why i have done above setting.

What i have missed please guide.?

While doing PGR i am getting above msg and when i go for above lot number system says lot number doesnot exist.

Manish

I

Accepted Solutions (0)

Answers (4)

Answers (4)

VL02N: Doubleclick on the material number in the line item–> You will see the Inspection lot number.

QE01: Enter the Inspection lot number and record the results, lock the MICS, and save the results.
QA11: Enter the Inspection Lot number and select “Accepted” in the UD field and save.
VL02N: Do the PGI. You should be OK now.
Former Member
0 Kudos

If you configured 05 Inspection type, system will create Inspection lot only after PGR.

If you configured 06, then Inspection lot will be created after delivery (non stock relevant). Only after clearing that Inspection lot, you can do PGR.

Check / attach the configuration under this menu.

IMG - Quality Management - Quality Inspection - Inspection lot creation - Inspection at shipping

Attach the screen shots of Inspection Lot origin to Delivery Type & Assign Inspection type to Delivery category

Also attach screen shot of Material Master QM View Inspection Setup.

Check QA32 by giving 06 as Inspection lot origin for that material.

former_member184536
Active Contributor
0 Kudos

Dear All

These are the setting what i have done for getting 05 stock relevant lot while doing PGR. But i  am getting that error msg, please guide

former_member184536
Active Contributor
0 Kudos

Hey

Issue is resovled.

Thanks for all you support

former_member491596
Participant
0 Kudos

Hi Manish

Can you tell me the steps for above process.

In my case inspection lot is generating but stock is not moving to quality.

Regards

Ashish

former_member491596
Participant
0 Kudos

Resolved

Former Member
0 Kudos

It means that there is one IL that is getting created after the Picking or PGI.Save PGI & check that IL for usage decision.

former_member184536
Active Contributor
0 Kudos

Hi Sujit

Error is showing while doing the PGR  and lot is not getting created as not able to do PGR

former_member620323
Active Contributor
0 Kudos

Hi

Save the delivery, after delivery save Inspection lot getting generated.

Then you have to do Result Recording & Usage decision

After that you will do PGI.

former_member620323
Active Contributor
0 Kudos

Hi,

Please save the Delivery,  then You will get Inspection lot no.

former_member184536
Active Contributor
0 Kudos

Lot not created while saving delivey. It will be generated after PGR i think but not able to do PGR .

Please help me out.

former_member184536
Active Contributor
0 Kudos

Hi Rahul

After saving the delivery and not doing PGR , i will got lot but it is not stock relevant i.e inspection stock tab is not there.