on 03-20-2013 9:25 AM
Hi team,
We had insalled EHP6 ECC6.0 and SRM 7.02.I have following issues.
1) We had activated Business Function- SRM_SOURCING_1, then SRM_CROSS_INDUSTRY_1 and SRM_PUBLIC_SECTOR_1 for PPS for EHP2.
But the PQQ tab or PQQ related fields are not coming in the Portal for 2 Envelope BID? Is any Bussiness functions need to activate?
2) We had installed C folder in SRM. We are able to login to C-folder.We have few issues
We maintained the System landscape settings in SPRO with Log System, RFC destination as SRM local , with RFC checked and Sys.type as Coflders.
When we try to create with the 2 bid envelope system is giving a dump screen as follows
http://REMOVED:5000/sap/bc/webdynpro/sapsrm/wda_l_fpm_oif
Error in connection to cFolder system
Error in connection to cFolder system
Function: /SAPPSSRM/CREATE_COLLAB of program /SAPPSSRM/SAPLEXT_RFX_PROCESS
Function: /SAPPSSRM/META_CREATE_COLLAB of program /SAPPSSRM/SAPLEXT_RFX_PROCESS
Method: /SAPPSSRM/IF_TECHBID_CFOLDER~CREATE_BI of program /SAPPSSRM/CL_TECHBID_CFOLDER==CP
Method: CREATE_RFQ_ADV_INSTANCE of program /SAPSRM/CL_PDO_BO_RFQ_ADV=====CP
Method: CREATE_NEW_INSTANCE of program /SAPSRM/CL_PDO_FACTORY_RFQ====CP
Method: CONSTRUCTOR of program /SAPSRM/CL_CH_WD_BOM_RFQ======CP
Method: /SAPSRM/IF_CH_WD_MAP_FACTORY~CREATE_RFQ_MAPPER of program /SAPSRM/CL_CH_WD_MAP_FACTORY==CP
http://REMOVED/sap/bc/webdynpro/sapsrm/wda_l_fpm_oif
and if we remove with the settings, when we do check on the RFX following error is coming and closing the session
Cannot connect to cFolder system; two-envelope RFx cannot be created?
Can any body help on this?
Hello Philip,
1. Please check whether you have configured the PQQ in IMG under Cross Industry Functions -> Application Settings ->Prequalification Questionnaire
This will have the PQQ drop down enabled for RFx type Two Envelope Bid process
2. You need to have a separate RFC destination created for c-folder and have this updated in the System landscape setting for c-Folder. This is required even if c-foder is set up on the same server.
Further I believe you have followed the steps mentioned in the below mentioned link: http://help.sap.com/saphelp_srm70/helpdata/en/43/143d2e25fc2be8e10000000a1553f7/content.htm
Also check whether BBP_Cfolder service activation is done by Basis team
The above should address your queries.
Regards,
KB
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Philip,
Check whether you have activated the customizing switch : SRM_701_Two_Envelope.
Refer below link for reference.
http://scn.sap.com/docs/DOC-33997
Please also check whether your connection with Cfolder and SRM is correct or not by testing service:
CFX_RFC_UI
Regards
Sushant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Gibi,
please explain in more details what you mean by:
"But the PQQ tab or PQQ related fields are not coming in the Portal for 2 Envelope BID"
Best regards,
Tamas