    Has anyone ever successfully done a batch level conversion from client to material level ? If yes how was it done and what were all the things to look out for ?

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member211618
Contributor
0 Kudos

Yes,system allow to do batch leveling for Client to material only, if u want to do leveling u need to consume/empty all batches in that plant then only u can do the batch leveling.