Dear,
We have following situation:
The production order is confirmed in several partial confirmations. Due to scrap, more has been consumed than expected. However, after backflushing the 329,150 M of material A mentioned in the production order, SAP switches to the follow-up material B. So 86,750 M of material B is also consumed, although there is still enough stock of material A.
Did anyone encounter this problem? Can anyone provide me with a solution for this?
Kind regards,
Joren
Hi Joren,
As you said material A consumed by 329,150 M as per the production order requirement, And 86,750 M of material B also consumed due to scrap, It means somone selected manually the material B to consume as extra material required.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
11 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.