work centre problem grey out

former_member220517
Participant
0 Kudos

Hi,

I have attached internal processing activity (Control key PS01) to network.

I want to enter work centre in activity and want to calculate cost of operation. But work centre option is not editable in cj20n refer below screen shot.

Please help me.

Thanks.

Accepted Solutions (0)

Answers (2)

Answers (2)

Brendan_Ward
Advisor
Advisor
0 Kudos

Hi,

Can you post a screenshot of OPUC Influences.

Also, check whether you have user-exit CNEX0002 activated. If so, deactivate and retest.

Regards,

Brendan

former_member220517
Participant
0 Kudos

Hi,

here I am posting OPUC incluences.

former_member220517
Participant
0 Kudos

still waiting for positive reply.

Former Member
0 Kudos

Please raise OSS message to SAP.

Regards,

Tushar

Former Member
0 Kudos

Hi,

Go to OPUC - Network Detail screen and check if Work center ( AFVGD-ARBPL) field is marked Ready for input.

Regards

Tushar

former_member220517
Participant
0 Kudos

Hi,

I have checked settings in OPUC, work center field is marked for input only.

Please guide.

former_member195427
Active Contributor
0 Kudos

Go to OPUB and make the field AFVGD-ARBPL as Input.

Regards

former_member220517
Participant
0 Kudos

Hi,

I have checked all field selection settings and found that ARBPL is maintained as a input field only.

Please guide.

Thanks.

former_member195427
Active Contributor
0 Kudos

After making changes have you checked it by creating new project or referring old one? Create a new project>NWA and check .

If unresolved, please post he screen shot of control key settings (OPSU) and network profile(Activity tab) (OPUU).

Regards

Ankur

former_member220517
Participant
0 Kudos

Hi,

I havn't changed any settings these settings are by default then also work centre field grey out for old as well as new project.

I'm attaching details of screen shot of control key and network profile.

Please guide.

Thanks.

Former Member
0 Kudos

In OPUC, for the work center field have you checked if there is any "Influencing" condition maintained?

former_member220517
Participant
0 Kudos

Hi,

Not found any influcing condition in OPUC.

Thanks.

Former Member
0 Kudos

Is this happening across your system landscape i.e. Dev, Quality and Production?

former_member220517
Participant
0 Kudos

Yes for all client.

sanjeevc
Active Contributor
0 Kudos

you need to project data reconstruct through CJEN after customization,

And try with new created project not existing one.

Regards,

Sanjeev

Former Member
0 Kudos

@Sanjeev - Are you sure about what you are talking? How is this related to reconstructing project info database? Could you please explain?

@PS New - Please check if there is any screen variant or transaction variant that is causing this issue. If nothing works please raise an OSS message with SAP.

former_member220517
Participant
0 Kudos

I haven't done any new customization.

sanjeevc
Active Contributor
0 Kudos

Gokul i know in reporting case project info database reconstruct will happen but after changing in configuration result is not getting then let say system consistency is. that is the reason for running CJEN. other wise need to raise OSS to SAP.

Regards,

Sanjeev

Former Member
0 Kudos

Hi,

Is this happening to you or with other users also. If it is not happening with other users it might be authorization issue. Did you try to enter in CN22 also. Aslo try CN02 (standard template).

Ask your Basis team to comare the both roles and find out what is missing.

Thanks,

Sudhakar