on 02-27-2013 11:01 AM
Dear Experts,
I am doing managed system configuration in SOLMAN 7.1 SR1.
I need to add one ABAP technical system. After RZ70 in ABAP system SLD got updated and technical system shows ABAP system but no other data is available(host,component versions,stc).
I checked SLD and it is having latest information but when i try to Resync from SLD i am getting error as "Resync of Technical System not possible due to missing Data Supplier"
Kindly give your valuable inputs since i am newbi in SOLMAN era.
System Details:
SOLMAN 7.1 SR1
OS: Windows server 2008 R2
DB: Oracle 11.0.3
Regards,
Sumit
I faced similar issue and this has been resolved by applying note 1766713.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I had this issue earlier. Resolved it using the following note.
1766713 - Re-Synch from SLD not possible due to missing data supplier
regards,
pavan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Pls. provide RZ70 log.
Maybe there is something wrong.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sumit,
1. Did you maintain the SLDAPICUST entry in ABAP System.
2. Are you getting any dump in st22 and sm21.
With Regards
Ashutosh Chaturvedi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sumit,
goto solman_setup and re-perform the initial configuration. Check the steps where you need to configure SLD and LMDB sync.
Regards, Richard
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.