Dear QM Gurus

My requirement is that i have to make RR mandatory before Usage Decision. I achieve this through STATUS profile. but status profile is assigned to inspection type so it will be applicable to all  material which are assigned to that inspection type instead of that i have to make it only for specific mateial series eg. mateials which starts from "3".

Is any solution for this?

Manish

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

You create a new inspection type and use the new inspection type for materials that start with a "3".  That inspection type is the one with the status profile assigned. 

FF