on 02-12-2013 4:45 PM
Hi everybody,
I have set 03-03-30 Fixed Storage Bin at material master (Warehouse Management 2 View).
I have created a transfer order from 700 to 710 the system proposes the Storage Bin 02-02-99, but the nearest Storage Bin to 03-03-30 is the 03-03-03 one.
As we can see, the 03-03-03 storage bin is not full (10% utilization)
I
What should I do in customizing in order to make system proposes the nearest Storage Bin?
Thanks,
Luis G.
Hi,
Generally,
bin determination takes place on sort sequence. Also, you can impliment user exists (
for this scenario.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
how have you defined the storage type control for the strategy near fixed bin? And the structure is... the fixed bin is 03-03-30? I am not very experienced with this strategy, but I think we would expect rather a 01 for the level. Not sure what the system makes out of that.
Brgds
Juergen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.