GR requires billing WBS element!!

Former Member
0 Kudos

in a project i have a PO # 5121002183 assigned to WBS element, and its value is recorded in CJI5 as shown:

Refer to attachments for details








































01.09.201201.09.20129AMAARBANILA-08RB1025101000Raw Material-Permt.WBSLA-08RB10-01-3-35PReq9121001845Diesel Green0L0LBP0
01.09.201201.09.20129AMAARBANILA-08RB1025101000Raw Material-Permt.WBSLA-08RB10-01-3-35POrd5121002183Diesel Green1041783,000.00L4,100,099LBP2,719.80
and when i'm trying to make GR reference to this PO, system triggers this msg.:
WBS element LA-08RB10-01-3-35 is not a billing element
Message no. CJ052
How come?!!

Accepted Solutions (0)

Answers (2)

Answers (2)

sunil_yadav2
Active Contributor
0 Kudos

Hi,

As per Sara, Please check along with FI Consultant because this may be problem of Cost elements/GL used for this WBS/MAterial.

thanks

Sunil

former_member209919
Active Contributor
0 Kudos

Hello,

Could you review your cost element in transaction KA03?

It should have category 1 and not 11

Regards

Former Member
0 Kudos

do you mean the cost element in the PO??

Former Member
0 Kudos

if this what u mean, so it has cost element category 90 HOWEVER the value 9o is not listed in the drpo down menue.

there are only those values:

1   Primary costs/cost-reducing revenues

3   Accrual/deferral per surcharge

4   Accrual/deferral per debit = actual

11  Revenues

12  Sales deduction

22  External settlement

former_member209919
Active Contributor
0 Kudos

Hello Byalya

This cost element category

  • 90: Cost Elements for Balance Sheet Accounts in FI
     

Check with your FI consultant if it correct this account is assigned to a material/service..for the GR.

Regards,