on 02-08-2013 4:40 AM
Dear SAP experts,
We are in SRM 7.01 with backend ECC 6.05 with classic scenario. We have scenario where we create SC with service items. As you might already know in SC, there is no service hierarchy in Shopping Cart. However when the PO is created in ECC (as we are using classic scenario), the PO will be using service hierarchy. We see that SAP is creating outline service by grouping services having the same material/service group and the same delivery date. And for the PO item itselft the PO short description in the line item is filled by group description.
However I saw that there is a field in SC called "Description of service item" (BE_ITEM_TEXT). When browsing, it seems that in old SRM, it is used to group services into one line item. However it seems not working now in SRM 7. Is there something that need to be done to utilize this field.
Best regards,
John
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello John,
Your question is little bit confusing to me, Could you please provide exact detail which you are looking for?
There is new features with EHP2 for service un-bundling; A very nice blog written by Tridip as well on the same. Not sure if you have went through that http://scn.sap.com/community/srm/blog/2012/08/29/adding-power-to-the-procurement-of-services-using-s...
If you are on EHP1 then standard should work if you have different delivery date then line item split and not bundle while creating PO along with the Description of Service item. Are you looking to not have spilted that one?
Thank you
Ritesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ritesh,
The problem is that SAP pass the service group as the description of the PO line item which is not very meaningful from business. At the moment there are 2 ways for our user to create requisition. One is through PR, in which the PR service will have hierarchy, which they will create like this:
Line item 1: Services on Site A
sub-line 1.1 Preparation
sub-line 1.2 Construction
sub-line 1.3. Closing off
Line item 2: Services on site B
sub-line 2.1 Preparation
sub-line 2.2 Construction
sub-line 2.3. Closing off
As you can see in here the outline of the services have a meaningful description which to show in which site the group of services are being performed.
Compare this if we create in SC:
Line 1 Preparation
Line 2 Construction
Line 3 Closing off
Line 4 Preparation
Line 5 Construction
Line 6 Closing off
If we create the PO, it will be grouped based on material/service group and delivery date. While the description will come from the group description
Line item 1 Const-serv-init
Sub-line 1.1 Preparation
Sub-line 1.2 Construction
Sub-line 1.3 Closing off
Sub-line 1.4 Preparation
Sub-line 1.5 Construction
Sub-line 1.6 Closing off
In which the grouping doesnt really helping the business.
i see that in SC for services, in addition of the description we also have field called "Description of service item" (BE_ITEM_TEXT). From older post in SDN such as in http://scn.sap.com/thread/333423 it is explained that this field can also work to collecting the services and I assume that if filled this can be used for us to give more meaning on the PO line item services (because even in BBP_PD the description of this field callsed "Short texf ot PO service item") So I kind of hoping that by filling this can give me the structure almost like the one that I have if I create PR/PO service directly in ECC.
However when I test this, it seems not working. Is there anyway I can utilize this field to reach my end?
Best regards,
John
Hi John,
Thank you for detail information on what exactly you are looking for. Your understanding of BE_ITEM_TEXT is absolutely correct and with SRM 7 also it should behave exactly what the SCN thread you referred with old SRM version.
I have quick question; You mentioned that you have tested it hoping it works Could you please share how exactly you have created the Shopping cart?
If i have to create SC, I will create like this;
Line 1 Preparation
Line 2 Construction
Line 3 Closing off
Line 1,2,3 BE_ITEM_TEXT (Description of Service Item): : Services on Site A
Line 4 Preparation
Line 5 Construction
Line 6 Closing off
Line 4,5,6 BE_ITEM_TEXT (Description of Service Item): : Services on Site B.
As i have posted a nice Blog from Tridip, If you have SRM EHP2 then un-bundling functionality.
We are also on EHP1 and we are not using hierarchy like you do so what i have done is implemented DOC_CHANGE_BADI and overwrite Description of Service from Item description what requester entered so that it will not bundle when PO created in ECC.
Thank you
Ritesh
Hi Ritesh,
What I have tried is creating the SC with this structure (flat):
Line 1 Preparation --> service description: services in site A
Line 2 Construction --> service description: services in site A
Line 3 Closing off --> service description: services in site A
Line 4 Preparation --> service description: services in site B
Line 5 Construction --> service description: services in site B
Line 6 Closing off --> service description: services in site B
I hope by having different description between line 1,2,3 compared with line 4,5,6, when creating the PO, SAP will create 2 outline item:
Line item 1: Services on Site A
sub-line 1.1 Preparation
sub-line 1.2 Construction
sub-line 1.3. Closing off
Line item 2: Services on site B
sub-line 2.1 Preparation
sub-line 2.2 Construction
sub-line 2.3. Closing off
But this is not happening, as SAP create PO classic with this outline:
Line item 1 Const-serv-init (description of the material group)
Sub-line 1.1 Preparation
Sub-line 1.2 Construction
Sub-line 1.3 Closing off
Sub-line 1.4 Preparation
Sub-line 1.5 Construction
Sub-line 1.6 Closing off
If you say that this should work, can you help me pointint out what needed to be done so I can influence the item splitting logic?
Best regards,
John
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.