on 02-07-2013 8:44 PM
Dear Gurus,
one of my raw material was batch managed with quality inspection type 01, now we have remove batch management tick from material master .
at the time of qa32 while doing UD system is throwing the error "assignment of a batch is required:though i have already remove the tick from material master.
please guide me.
siva
Its because ,it will always refer to master data when Inspection lot was created and not the have any effect even though master is changed later .
In short for this problem you have to assign batch to Inspection lot in QA02 or cancel lot & create new one.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Have you tried this SAP Note??
SAP Note 170081 - UD: Possible to make UD without batch assignment
Also check below thread for some more SAP notes. Based on your SAP Version, try any of the notes.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.