cancel
Showing results for 
Search instead for 
Did you mean: 

MIC level DMR

rajesh_sutar2
Active Contributor
0 Kudos

Hi,

Could anyone please tell me how or where to assign DMR at MIC level.

I want to SKIP MIC inspection every after 2 inspection lot if MIC inspection is accepted.

As I know we assign DMR to sampling procedure & then we assign the same sampling procedure to MIC. Is it correct.

If it is correct, its not working as per my requiremnt.Where I am wrong.

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

rajesh_sutar2
Active Contributor
0 Kudos

Resolved