Changing inspection specification at results recording stage

former_member357396
Participant
0 Kudos

Hi,

Is it possible to change inspection specifications in results recording. Or if I change it in quality plan does it change in the lot after it is released

Regards

Badri

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Is it possible to change inspection specifications in results recording.

- NO ,Not possible.Once Inspection plan is assigned & sample is determine ,you can not change specification.

if I change it in quality plan does it change in the lot after it is released

-Every change in Inspection plan will reflect in IL after creation of new inspection lot.