on 02-01-2013 9:00 AM
Problem : Production System is allowing to create second Sales order with reference to fully referred Quotation.
As per current system settings, it should not allow to create second Sales Order with refernce to quotation,
if quotation is fully referred.
When I tried to replicate the scenario in Quality server, system doesnt allow me to create the second sales order.
i.e. it is behaving as per the config settings.
I have checked copy-control settings in VTAA at item level and found as below:
Pos./neg. quantity = +
Update document flow = X
The completion rule set for item category is B.
Kindly help me what could be the problem?
hi,
Please check your Copying requirments routine.it needs to be 301
Sivavasireddy
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.