Business System of client 001 change

We have a PI system SAP NetWeaver 7.3 and Solman system SAP SOLUTION MANAGER 7.1.

EWA for PI reports an alert under

-- >PI operations for SID

--> Integration Engine Configuration for SID

--> Business system of client 001

--> PII Housekeeping jobs

and in here, it recommends to schedule standard house keeping jobs.

But our default client is 300. I've gone through note 940309 (which i know is not for our versoin), however everything is fine as per the note except exchange profile which shows 1 as the value in the client field.

However I dont think this will have an impact as there is an alert which says "Note that changing the database connection for the exchange profile may effect other SAP NetWeaver Exchange Infrastructure components. This page is obsolete and is only used as a fallback option if the RFC destination does not exist"

Is there any other option within PI 7.3 that controls client 001 business system status. 

Basically I want to get rid of the alert above. Any thoughts please.