on 01-07-2013 10:39 AM
Dear
I have one material for that insp lot is assigned-04 type.I have created one order & confirm that order.Automatically inspection lot is created.
After that I did UD for that material.
After 7 days client is telling to cancel that order.
So now at that time of cancel order system is showing-qa046 error.
how to overcome from this
ALLY
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
ur lot already cleared from QA, so first of all check whether the stock is there or not. If qty. which is there in ur order is available in UNRES stck then cancel the order and take the UD reversal and reprocess it again as per ur client requirement.
my Question is: what message u get during cancellation and UD reversal is available in your system or not?
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
System is throughing this message
Message no. QA046
You are attempting to reverse a goods receipt although quantity postings have already been made from the inspection lot. This means that stock for the goods receipt has already been transferred and, for this reason, a cancelation of the document is no longer possible.
Ensure that the postings in QM (within the usage decision transactions) are carried out.
Hi,
Ally,
u need to provide this sap note to ur technical team , first the basis guy and then programmer, u need to sit with programmer and guide them.
please check the link and provide them to ur programmer:
http://xa.yimg.com/kq/groups/8392918/1968947352/name/SapNote_175842.pdf
regards