Post batch from own Q stock to project Q stock

maarten_muetgeert2
Participant
0 Kudos

I've a question. We'd like to post batches in own quality stock with an open inspection lot to project quality stock. Is this possible? When the batch is in unrestricted stock mvt 412 (special stock indicator Q) can be used for this. But i think this only checks unrestricted stock.

Thanks for you help on this.

Accepted Solutions (1)

Accepted Solutions (1)

maarten_muetgeert2
Participant
0 Kudos

It didn't work. We released the batches. Did a 412 mvt and posted it back to quality again.

Thanks anyway for your suggestion.

former_member42743
Active Contributor
0 Kudos

I think you have to post this outside of quality to project stock.  Then post it back to QI.

FF

maarten_muetgeert2
Participant
0 Kudos

That's exactly what we did. The same for blocked stock.

former_member42743
Active Contributor
0 Kudos

So is that working OK for you?

Would it be possible to activate an 08 inspection lot so that you can post the material from UR to the project stock and create the inspection as a result of the stock transfer?  You might need to post it to a different storage location during the process.

FF

Answers (1)

Answers (1)

Former Member
0 Kudos

I think, 412 Q will work out.

If not, Check movement type 415 without any special stock indicator.