Hi,
I am trying to Close a project.But in my project one WBS(Eg:DC-201201) having Asset number but there is no Actual cost as well as no AUC and FXA value.Am using an investment Profile,So system generates asset number automatically to all wbs.While setting the system status Close to WBS (Eg:DC-201201)it showing an error message as given below.I searched in forum but i cont find relevant solution.
Message no. CJ824
While editing an asset in construction for the WBS element, an error occured.
Processing stopped.
Go to the asset in construction for the WBS element and correct the error that appears there.
2.There is no Asset value in year 2012.
Pls give your valuable solution.
Are you sure that, the WBS doesnt have actual costs un-settled?
Sumanth
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I tried what u said.But facing an error while doing ABAVN.
Message no. AA324
Transaction type 200 belongs to a transaction type group, which can only be used to post to assets to which posting has already been performed. However, no postings have been made to this asset.
Use a transaction type from a transaction type group, which can be used for the first acquisition to an asset.
Hi,
You say " there is not actual cost it is top level WBS"
You cannot close a top level without closing the low level WBS, then the system is trying to close the low level WBS.
To close a WBS with AUC.. Previously you have to have settled all the amount in the WBS to the FXA, it cannot be anymore in the AUC.
You need to enter a FXA in WBS with actual costs ( settled or not settled) and execute a settlement.
After all actual costs are in the FXA.. You will be able o close the low WBS and the top WBS.
Regards,
Sara
Pls Explain me how to close a project when we r using Investment profile for asset number generation.It is generating asset no for all Level WBS. but for few WBS only cost implications will present.
Error MSG while deleting Asset
Asset 180000000053 0 belongs to an investment measure. Deletion not allowed.
Message no. AY187
Asset 180000000053 0 that you want to delete is an asset under construction assigned to an investment measure.
The asset cannot be deleted.
Hi Mohammed,
System will created AUC automatically when you create the investment measure ( order or WBS element) , and will delete it automatically if it is not used.
Try removing Investment profile from the WBS element in which AUC is generated. System will give you warning message and will then allow you to proceed.
Also please check solution mentioned below thread which is little simiar to your querry.
http://scn.sap.com/message/7959343
Regards
Tushar
Please search forum first before starting a new thread
http://scn.sap.com/thread/3284769
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Could you check in AS02 transaction for you AuC which is the problem when you try to edit the asset? It is possible you have another message that can help you
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ya i find one AUC created in back ground in the table as well as CJ13.Because of Investment Profile it created.But my doubt is without doing any settlement (because i dont have any actual values for the WBS as well as AUC values) to the WBS am trying to change the status TECO to CLSD.
My Project Structure.
level 1 WBS-DC-201214-01
level 2 WBS-DC-201214-01-01,DC-201214-01-02,DC-201214-01-03
When am releasing the project the AUC numbers automatically generated for all wbs.But an doing Procurement activities to Level 2 WBS Not for Level 1WBS.But wen an closing the Total project am getting an error that the lavel 1 WBS has now AUC.
Pls guide me.