on 12-14-2012 1:13 AM
Hi,
While trying to create confirmation for the PO , the quantity field is not editable. its 0 by default
Out standing quantity is 1 , its material PO in SRM 7.0
Please assist.
Regards,
Niru
Also check whether PO has confirmation control key or not. To post confirmation from SRM, PO in ECC system shouldn't have confirmation control key.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Check if the PO needs a GR to be posted.
Also, make sure that you are in the Change mode.
Select the confirmation line > go to the Details push-button and then try editing the Quantity.
BR// 420
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.