on 12-12-2012 2:15 PM
Hi,
We are not able to reconcile the Sub-contracting Challans, this is basically due the error done by the end user.
The scenario is as below:
Sub-contracting PO was created for two Materials
Raw Material was sent to Vendor using 4 challans, three was created on 25.11.2012 and one challan was created on 26.11.2012
The user did the Goods Receipt of both Materials on 25.11.2012.
Initially when the user tried to reconcile the challan, the system gave an error showing the mismatch in the material document date. After seeing the above error, the user reversed on line item of the Goods Receipt document thinking that the SAP system will allow him to reconcile the rest challans.
Again when he tried to reconcile the balance challan, the SAP System is not allowing.
“Material HDN002-M is not assigned fully, short by 14.000 NOS”
This error is coming for the Material which was reversed by the User.
Please guide us how to reconcile the challans now. One of my friend is saying that the Material document should be reversed completely i.e. both line items. Since we don’t have stock, we can’t reverse the same.
I have attached the Screen Shot for reference.
Please guide.
Regards,
PK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If the cancelled material (which is cancelled in the goods receipt) and the material which is to be reconciled, are in the same challan then you have to post a new corrected goods receipt for the cancelled material and then try to reconcile the challan. OR . In J1IFQ do not enter the challan number which consists the cancelled material, other challans will get reconciled.
Hi,
Materials were sent using same challan and as I told you, we have cancelled only the first line item. The second line item was not cancelled as stock was not available.
Is it possible to build the dummy stock, then reverse the second line item. After the we will do fresh GR and reconcile the challan. After that we will reduce the stock.
Please refer the screen shot attached earlier, challan 2239.
Please guide.
Regards,
PK
Hi,
As you have one challan for two line items and one line item is cancelled through MIGO then you need to cancel second line item also. Then post a new corrected goods receipt which consists both line items and then reconcile the challan.
As you told, there is no stock for second line item then i think, as you described is the only alternative.
Hi,
Please use forum "Internationalization and Unicode" for CIN issues.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.