on 12-12-2012 2:46 PM
Hi All,
I have a basic question.
I want to setup a scenario in which , product ( ex MM1000 ) will be in available in stock at one of the storage location say 0001.
When I will create a sales order and perform availability check , it should give me today’s date in return and schedule line should be generated.
So for it , what master data I need to set up , please share.
at this moment when i am creating a sales order , its giving me date which is todays date + 4 days., need to know from where this 4 days system is picking.
Thanks
Hi Ritesh,
SAP System picks up these days from various lead times such as:
so the culmination of all these times gives you those 4 days.
If you want to check, patiently check all these records, and you will figure it out.
I hope this will help you.
Regards,
Sridhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks sridhar,
below are findings
so i am stil on same stage ,
Thanks
Ritesh
Thanks, but there is also nothing.
when i see the sales order created , in shipping tab , there is no route picked , the field is empty.
so i guess 0VTC is not rlevant here.
correct me if i am wrong.
I also checked , LE-- Shipping -- scheduling ---delivery scheduling and trasportation scheduling-- maintain duration, there also i didnt find any relevant entry for the shipping point sales order is picking.
Thanks
Ritesh
Thanks a lot sridhar for all your help.
Here i dont have option to mark this thread as answered or help full point.
Regards
Ritesh
Moderator Note: |
---|
Being a basic and repetitive query, this discussion was unmarked as question. Thread locked for future post. |
Message was edited by Space Moderator: Jyoti Prakash
Moderator Message:
Its very basic & repetitive query related to Availability check & lead dates.
Please search before posting any discussion.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I know its very basic , Belive me i have given a hard try.
but when didnt find any thing which can help me , i posted it.
Thanks
Ritesh
Moderator Remarks:
Searching for relevant information, is not big deal. Provide you use proper search term or look in relevant spaces, like SAP help, SCN wiki so on and so forth. As you are not a regular OP in sales and distribution space, I have not lock the post for response.
Sridhar *** & Narendra Konnipati
Please encourage people to search on basic and repetitive query, instead of spoonfeeding them.
Hi ,
Please have look into your sales document type in T.Code "VOV8 ",there check have you maintained days as 4 in the Field " Lead Time In days " under tab Requested Delivery Date / Pricing Date / Purchase Date .
Side Comment : Please check in your sales order which document type flowing there .
If you have any doubts please let me know.
Thanks,
Naren
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.