on 12-11-2012 5:05 PM
Hello ,
We are in process of upgrading PI 7.11 system to PI 7.31 dual stack
Our customer needs to use NW BPM functionality on PI 7.31 dual stack system.
My query is can we use PI 7.31usage type with NW BPM 7.31 usage type in NW 7.31 system.?
Note: Customer knows that ccBPM is already present with PI dual stack
they need all the NW BPM components to be installed on PI system.
Also we have a CE 7.2 system in our landscape, hence need to know if customer can use BPM functionality of CE 7.2 and PI 7.31 together.
Please assist asap...
Regards,
Anuradha
Hi,
With a PO license, which includes PI, BPM and BRM, you can installed all 3 in your environment, whether it is within a single SID or on multiple servers. A PI license by itself does not include BPM. If this is the case, then you will have to convert the PI license to PO license.
If you install PI as dual-stack, then BPM will have to be installed on a separate server. Only java-only PI allows you to install BPM on the same SID as PI. Functionally, they are the same.
Regards,
William Li
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Anuradha,
Please check recent blog from William : http://scn.sap.com/community/process-orchestration/blog/2012/12/07/upgrade-options-to-the-latest-pro...
It'll answer your most of your questions.
Regards,
Yashu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello All,
Thanks for your reply.
We need to confirm if NW BPM 7.31 can be installed as a part of PI 7.31 upgrade project where source system is PI 7.11 dual stack and target system will be PI 7.31 dual stack.
I understand that PO is one of the option to use PI + BPM together on single stack, however, I need to know whether NW BPM is possible with PI 7.31 single stack.
Regards,
Anuradha
Anuradha,
Just quoted from Michal's answer to the below blog:
"It has been said many time that Process Orchestration (PO), which bundles PI, BPM and BRM functionality together, can be installed as a single SID. This is true only for the java-only installation of AEX. With a dual-stack PI installation, BPM/BRM will still have to be installed on a separate JEE server"
http://scn.sap.com/thread/3212718
Also the check the blog of William: http://scn.sap.com/community/process-orchestration/blog/2012/05/31/download-and-installation-of-proc...
On your last part: Direct Upgrades are available from SAP NetWeaver CE 7.1, SAP EHP1 for NetWeaver CE 7.1, SAP NetWeaver CE 7.2, and SAP NetWeaver 7.3 (CE and AEX based Usage Types) to SAP EHP1 for SAP NetWeaver 7.3
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As per my knowledge i dont think it is possible, when you chose dual stack it doesnt come with NW BPM,but you can buy new licence for NW BPM .
my choice would be Single stack+NW BPM instaltion model.
better to contact SAP.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.