cancel
Showing results for 
Search instead for 
Did you mean: 

Shelf Life Expire Date

lakshmi_prasad7
Contributor
0 Kudos

Is there any provision for  Trigger Inspection lot against  shelf life Expire date now we are trigger inspection lot based on  inspection intervals what we maintained in Material Master. SLED we are maintained  against Batch at the time of  Usage Decision.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

No.  there is not.

But there is a user exit you can use to keep the two values in sync using whatever logic your company wants to use.

The exit is:

  QEVA0003 Calculate "Next inspection date" for batch                 

FF