on 12-07-2012 8:28 AM
Hello!
I need to apply 10 notes before continue EHPI installation by SUM.
I implemented this notes to DEV system(9 of 10 have status can not be implemented, 1 of 10 was implemented and moved to QUA system by transport request). Is the way to move status "cannot be implemented" of remaining notes to QUA and PRD systems? I need to make it because SUM checks status of implementation this notes.
OR should i switch PRD and QUA systems to modificable status and download and implement note in each system?
With best regards DS
Hi Drizin
Are you implementing Enhancement package or doing an upgrade?
Just go to snote then go to download the Sum's suggested notes and tranports the request of your Dev system.
Cheers
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
is it possible only to transport the Status of a SAP Note ?
I Need this, because the SAPOSS Connection in our Production System did not work.
Gruß
Toni
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
If you are applying notes for upgrade, apply notes individually on dev and prd. I remember when i transported these notes for upgrade process was difficult for me handle version mismatch dumps in production.
For better understanding following link will help you
Regards
Mahesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Cannot be implemented ,means the note is not valid for your sap version,,so no need of those notes,,only capture the implemented note in a TR and transport to Qua & Prd
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.