on 11-29-2012 6:52 AM
Hello all,
I am facing folowing problem.
1. I have created DMR and first stage is 10. here number of inspection is 1 and number of rejection is 1. if there is 1 rejection (1 out of 1) then systm should remain at stage 10 only. if acceped system should go to stage 20.
2. second stage is 20.which is skipped stage. here number of inspetions are 5. and number of rejection is 1. if the there is 1 rejection ( 1 out of 5) then system should go to stage 10. if all accepeted systm should go to stage 10.
I have using this DMR at inspection Lot level.
my problem is.
1. when system comes at stage 20, and if first skipped lot gets rejected then also system skips remaining 4 lots and after that only it moves to stage 10.
2. it means that DMR is not working properly.
Request you all to help.
Aditya
HI
Simply do one thng whenever there is any rejection & you want to continue with normal inspection not SKIP lot , just do the result recording for that SKIPPED inspection lot by clicking on continue button then do the UD as rejected, then system will show the next lot as normal not SKIP lot
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.