on 11-22-2012 1:16 PM
Hi All
When I was trying for initial download of materials in our Quality system I met with the above error in SMQ1 in SRM stating 'The current application triggered a termination with a short dump' .
When I checked the dump in R/3 it said, CRMATAB is empty, it must be filled.
But I checked the same table in our production system and it is empty there too. And in production systems I could replicate the materials without any errors.
I have checked all the settings of Quality system with that of Production systems and there is no difference.
I have checked numerous notes and threads as well. But couldn't find a relevant information.
Anyone please suggest why is this error only in Quality system?
Hi Dhananjay,
Please refer to oss note 1498111. This should resolve your issue.
Thanks,
DT K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi DTK
Thank you so much for your reply and apologies for delayed response. Was too busy at work
I checked this note and yes, i guess this is feasible for me. Only problem is my SP level of PI-BASIS component. I guess i can somehow work it out.
But my question is, every setting, including CRMATAB table are exactly same in Prod and Acceptance environments. (both the environments, CRMATAB in r/3 and SRM are empty)Queue runs in Production but doesn't in Acceptance.
I am just trying to figure out what could be the reason for this failure in Acceptance system.
I hope you can help me.
Thank you so much
Dhana