Defects recording against a particular Inspection point and Notification in QM

Dear Sir,

In my scenario, i am using the inspection point for results recording. Production of finished product is a continuous process so result recording is done in every four hour. Finished product is not batch managed. So for whole month there is only one Inspection lot. Inspection point do not consider the lot means during saving the result recording it do not ask for quantity. So quantity is not considered.

No upper or lower limit is created for MICs.

Now here we first do result recording against a particular inspection point through QE11. These thing happens through BDC recording. Some time it happens that the some MICs values are not up-to the mark. So for that we want to do Defects Recording against it and also put the quantity at this time.

We also required that we want to deduct this quantity from the stock of finished product. Is it possible.

I have also seen the notification tab, if possible please explain it also.

Please reply as soon as possible.

And i also want to know that can we do quality score against a particular inspection point. If yes, then also tell me about this.