on 02-21-2007 6:50 PM
Hi all,
SRM 4.0 (Server 500) SP10, Extended Classic, R/3 4.7
For some POs replicated from SRM to R/3, the link to the Requisition (originating from a PM order, or a network) does not appear on the PO line(s). In addition, the link to the PO does not appear on the Req (most of the time :). However, in SRM the full document flow is displayed correctly (Preq-PO-Conf-Inv).
This results in double commitments, and other inconsistencies (e.g. reporting).
Has anyone experienced this system behavior, and if yes what is the resolution?
Cheers,
Serguei
No one has had this problem?