cancel
Showing results for 
Search instead for 
Did you mean: 

Charms Configuration in EHP1 solman 7.0

Former Member
0 Kudos

Dear Gurus,

I have to configure Charms for R3(ehp6 ecc6) and BI landscapes.But currently we have only 1 R3 system(SID--ED1) which is on rental hardware.Real development system(ECD) will be built by system copy of ED1.

1.Can i configure charms with virtual systems in ED1.

2.If possible then what are post system copy activities  I have to do on real developmen system.

If not possible please suggest a sutiable solution for the above scenario.

I have gone through https://websmp109.sap-ag.de/rkt-solman and  http://scn.sap.com/people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-man...

Thanks,

Amarnath

Accepted Solutions (0)

Answers (1)

Answers (1)

prakhar_saxena
Active Contributor
0 Kudos

Hi

check Q4 here for virtual systems and it will answer ur queries

http://scn.sap.com/people/dolores.correa/blog/2009/07/22/change-request-management-scenario-usual-qu...

Regards

Prakhar Saxena

Former Member
0 Kudos

Hi Gurus,

Now i have two real systems(DEV,QAS) and one virtual system(PRD).

  Facing issue while Activate Change management error show below
   no consolidation system found for sid-100
   No track for project <poroject> with log. system sid/client
   Message from function module /TMWFLOW/CHECK_PRJ_CONS: No export system for SID-client.

I have done below things.

1. STMS configured with standard three system route and created domain link between solman and R3 domain controller also pre     TMS steps performed(tp parmater CTC=1) etc.
2. Created systems in SMSY with required RFC and assigned the landscape to respective logical components.
3. Created project,added these logical component in SYSTEMS TAB(SYSTEM LANDSCAPE) and created IMG Project(IMG TAB).
    But when activate Change request management resulting above.

  I searched sdn fourum for the same found a solution that I need to create single route in the entire landscape.
  But which layer i need configure (i.eSAP and Z<SID>) between DEV to QAS and QAS to PRD.I here by attached the configured   transport route in STMS

Kindly guide me ASAP. I need your help urgently.

Thanks,
Amarnath

Former Member
0 Kudos

hi,

consolidation route is nothing but the route starts from your dev system, its normally dev -> qa, after looking at your screen shot, no issue in the route. But the issue might be with the client. because Charm is client specific.

have you added the appropriate client in stms under your consolidation route.

if you not known the steps, please follow step 2 on the below guide

Thanks

Jansi