on 11-20-2012 11:53 PM
Presently we are using dual-stack split tool 2.0 SP2 tool in Netweaver BI, and we need to use the keep database option in a High Availability system in windows 2008.
Hello Jitendra,
You can find in the Guide the following:
When you choose the 'Keep Database' option, SAPinst exports the Java
file system on the dual-stack system. It uses this export to reinstall a
central services instance (SCS) and a central instance (CI) for Java.
They can be installed on one host, on different hosts, or on the source
system hosts again. Additionally, SAPinst adapts the Java schema of the
database of the dual-stack system to the target Java system.
After the installation has finished and the System Landscape Directory
has been reconfigured, SAPinst removes all Java parts from the
dual-stack system except the Java database schema.
So, if you would like to have the Java database schema separeted from
the ABAP, you need to run the Dual-stack splitting tool and choose the
option "Move Database".
I hope this will help you.
Regards, Premsukh Bishnoi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.