hi

When I want to  create the sales order, I would like to enter the material and the relevant quantity. Then system must check the value of the sales order to the value of the contarct. Contract is considered as open until the cumulated sales order value created withe reference to contarct is less than the Contract Value.

Once the value is reached, system stops you to create the sales order reference to the contract.

How can I do it.

I have created a contract VA41 ZWK1  with a value, then I have created a sales order ZWA, but I have not the line of scheduling in the sales order!

Anybody could tell me how can I do?

Thxxxx a lot

Kari

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184701
Active Contributor
0 Kudos

dear,

you need to run t-code VTAA and check out the copying control parameters for your sales doc types

ZWK1 -> ZWA

i recommend you to delete your record and create it again by copying from exisitng record WK1->OR

after that create a new contract + order and test it

regards,

former_member1021627
Participant
0 Kudos

So normally I must have the field scheduling in document type WA?