feasiblity for report through SPC

former_member1124592
Participant
0 Kudos

My requirement is to configure SPC. now after configuring SPC user wants a monitering report.

Scope-How will the report work?

Well the report should generate a notification indication like certain materials(for exacmple material A's critical parameter (internal diameter measurement) was checked on 10.04.2012. Its next scheduled date is after 6 months i.e 10.10.2012. Please guide me from where to start. Please consider that i will map the SPC somehow, but what is to be done after that.?

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

This is part of schduling the work. For this we need batch management so that we can do the schduling accordingly

Batch management option in material management

Next inspection date in batch MSC2N

Inspection interval mentioned in days in quality managment view

Former Member
0 Kudos

Hi

Use tcode QGC3