cancel
Showing results for 
Search instead for 
Did you mean: 

configure freight on basis of weight of material

Former Member
0 Kudos

hi gurus,

we have a scenario in which i want to configure freight of material on the basis of weight of the material ( pro rata basis), plz suggest how can i do it

thanks in advance

chirag

Accepted Solutions (1)

Accepted Solutions (1)

jignesh_mehta3
Active Contributor
0 Kudos

Hello Chirag,

Go to V/06 - Conditions & open SAP Standard Condition Type for freight - KF00

Here under Control Data 1 you have box for Calculation Type.

You can enter D - Gross weight or E - Net weight here.

This will ensure that calculation base for Freight Condition will be Gross or Net Weight of the Material in respective Line Item in Sales Document.

For Pro-Rata basis you can enter scales for the Freight Condition Record.

Thanks,

Jignesh Mehta

Former Member
0 Kudos

Hi Jignesh,

Thanks a lot for your prompt response

Answers (0)