on 10-31-2012 3:07 PM
Hi,
I need to reserve stock against a job. I can do it in CJ20N. My primary concern is to transfer stock from one job to another job.
By using CJ20N i can delete the reservation against a job- stock goes back to storage location - issue it to another job. This is a 3 step process.
I need to be able to transfer stock from one job to another job without using storage location as an intermediary.
Thanks,
Dee.
If the stock is project level stock, do transfer posting from one proj to another by movement type 415Q.
AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Deepak,
Whether its project stock or plant stock, storage location for storing material is a must in plant.
Pick a any material and go to MM03 and check for Storage location views or you can use RSEB table you will find storage location.
What I assume from your post that, you have material in inventory that is generic stock. You can consume inventory material for any project or general requirement also.
Coming to reservation against job against your Network requirement which are made against available in inventory, its only reservation but still you can consume for another job and no need to referene while transferring from inventory to consumption. These resevations are not so rigid as projec stock.
You can check with your WM consultant how he can do without using storage location.
Regards,
Sudhakar
Sudhakar,
I do have a storage location defined and stocks are at that storage location.
I have stock reserved against a job (network+activity). It is important to reserve against a job against a first come first serve basis. In exceptional cases this reservation has to be tranferred to another job. It is not consumed by the new job, rather only the reservation has to be transferred to another job.
Deepak,
What I understood from your post is, that you have an activity A against which reservations have been created for a particular material, now there is an another activity B for which the same material is required on urgent basis, now what you are trying to ask is, can the reservation created for activity A be transferred to activity B? (Am i rite?) If that is so, please understand that you cannot transfer a reservation created for a particular activity to another activity. What you should do is, for activity B system would have created another reservation, issue the material for this reservation instead of reservation created for activity A.
if i'm understood your requirement like you want to transfer reservation
I assume not possible in standard sap reservation transfer. if you want to use material which already reserve with XXXX reservation no. suppose, (don't have extra material for use in new job).
then you delete first reservation material will come it's actual location where material was avail for reservation. then create new reservation for new job.
Regards,
Sanjeev
What are u referring as job here?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.