Hello All,

One of our customer working with SAP ECC 5.0 with MS-SQL 2000 

SAP information

SAP Version : ECC 5.0

Database: MS- SQL 2000

Operating system: Win 2003 x32bit

they want to change there OS Platform from win 32 bit to 64 bit along with database upgrade.

I need system copy with database backup restore method?

I have created a dummy system with same SID and System no. and i am trying to restore a backup. Backup restoration completed

successfully but unable to start SAP instance.

How can i copy a system with backup restore method?

Best regards

Amol Dounde

Accepted Solutions (1)

Accepted Solutions (1)

former_member182034
Active Contributor
0 Kudos

hi amol,

Please have a look below note and link because these are helpful.

Note 683447 - SAP Tools for MS SQL Server

Guide

Steps

Regards,

Former Member
0 Kudos

Hi Abdul,

Thanks for your reply

I am trying to install ECC 5.0 on win 2008 Server with Mssql 2005 with R/3 Load method

Installation done successfully but after installation i am trying to connect to system vai logon pad

after putting user Id and Password it is generating a dump called START_CALL_SICK

in SICK it result

OS release Windows NT 6.1 7601 Service Pack 1 2X AMD64 Level6 (Mod 23 Step 10) is notsupported with kernel(640) 

Can you please tell me does Win 2008 Support 640 kernel

I have taken help of sap note 1375494 but not useful one.

Best regards,

Amol Dounde

former_member182034
Active Contributor
0 Kudos

hi amol,

please follow the below steps.

1. Start transaction code SICK or SM28 to analyze the error.

2. Go to RZ10 and check the rdisp/wp_no_enq is at least 1.

3. Restart the system.

4. If error still occurred, apply new kernel upgrade and restart the system.

If there is exist different server model in your environmnet

put the following entry in BOOT.INI

/usepmtimer

"CPU timers not synchronized. Check note 1036194.".

Regards,

Former Member
0 Kudos

Hello Abdul,

Thanks for your suggestion, but i think SAP ECC 5.0  does not support to WIN 2008 Server

pleas check this

http://scn.sap.com/message/10831963

Thanks and regards,

Amol Dounde

former_member182034
Active Contributor
0 Kudos

Dear,

You did not check the PAM before to start.

If you want to start any installation than you first search some information about it and start.

Regards,

Former Member
0 Kudos

Hmmm......you are right and i really apologies for my mistake

former_member182034
Active Contributor
0 Kudos

Dear amol,

If your query is answered then click on below tab.

Correct Answer

and if any reply is helpful  then click on

Helpful Answer

Regards,

Former Member
0 Kudos

Hello Abdul,

can you please tell me What will happen if i keep my DEV server on 32 bit and Production on 64 bit?

Best Regards,

Amol Dounde

premsukh_bishnoi
Contributor
0 Kudos

Hello Amol,

If you keep your DEV on 32 bit and PROD on 64bit then there will be some dump  related to memory because  memory management is different for both 32bit and 64bit OS.

Transporting wont be a problem between 32 and 64 bit systems but having

them at different SAP component level as you are planning is not at all

recommended as you will definitely face inconsistencies.

So, if you are updating any one of the system in landscape then please

do it for ALL the systems in landscape (dev,qas,prd).

Regards, Premsukh Bishnoi