Maintenance Plans not trig erring.

Former Member
0 Kudos

Dear All,

We extend the factory calender for 20 YR's after after changing the factory calender there was a problem with Maintenance Plans those are not generating calls automatically and remains in " Schedule save to call" status only.

Is there any changes to be made for the maintenance plan once the factory calender is extended.

Regards,

Bhanu Pradeep.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Check maintenance strategy if you are using factory calendar.

Former Member
0 Kudos

I feel, nothing is required. But what is the scheduling period has been given in maintenance plan??

Whether this is time based or performance based plan??

What about before changing the factory calander?? Is it called automatically??

Have you selected Release Immediately in order configuration??

Former Member
0 Kudos

Dear Maheswaran,

Yes we selected release immediately in configuration .

And is it mandatory to run IP30 every time to generate the Order through plans?

sebastian_lenartowicz
Active Contributor
0 Kudos

Greetings Pradeep,

Yes, you need to run either IP10 (for each plan) or IP30 (batch scheduling) to generate the Orders.

Alternatively, you can set up a Batch job for IP30 (report RISTRA20)

http://scn.sap.com/thread/730884

http://www.erphowtos.com/sap-bw/1-how-to-schedule-batch-jobs-in-sap.html

Former Member
0 Kudos

IP30 can be used to generate PM orders for bulk maintenance plans. Also we can make it automatic. Apart from these known features, there is no thumb rule that we have to run IP30 everytime.

Please answer my other queries as well which I asked in last post.

1. What was scheduling period you maintained before changing the factory calendar??

2. Before was it generating orders automatically??

3. Time based or Performance based plan??

Former Member
0 Kudos

1. 5 Years Scheduling Period before changing of factory calender.

2. No every time my user running ip30.

3.Time Based Maintenance Plans.

Former Member
0 Kudos

After changing factory calender, it is advisable to reschedule all the plans.

This will take care of all previously called plans to change according to new calender.

How frequently do you carry-out IP30?

Is it background process?

James Prabaharan