on 10-25-2012 7:01 PM
Hi folks
i have a doubt regarding to this kind of modeling.
I've heard about its possible to create same models ussing BPMN as the xxBPM created ussing Integration Processes in PI.
as a policy in the company, I am working, the use of ccBPM is not possible so iam trayin to find other possibilitie to archestate processes.
for example: Do i need PO to do this or is possible to install a plugin in NWDS .
Rigth now PI 7.1 is being used.
Please Advice
Best Regards
Rodrigo
Rodrigo,
PI 7.3 single stack comes with BPM instalation option, if you have BPM licencing model then you can create BPMN like ccBPM, but there were changes in notations point of view and the flow how it works.
If you are on PI 7.1 then it is not possible to use BPMN,modeling prupose you can use standard PI Modeling concept.
Regards,
Raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
just to add:
>>>>Do i need PO to do this or is possible to install a plugin in NWDS .
in PO (7.31 java stack onlu) - you have single stack with BPM already so no need to install anything else,
Regards,
Michal Krawczyk
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
11 | |
10 | |
9 | |
8 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.