on 10-23-2012 1:01 AM
How to configure a condition which should be added to net value and post the accruals.
Example;
Material cost is = 200
Freight is = 100
Total is = 300
Freight should be added to material cost and this value should be accrued at a time.
Please let me know how to do this
Thanks