on 10-20-2012 3:47 PM
Hello All,
I am facing a peculiar system behavior.
I am doing a GR against a purchase order for material which is relevant for quality. Along with this the skips is allowed and Automatic UD is allowed.
I will explain the situation:
PO qty: 16K
first GR qty: 4K
Inspection lot created: status:REL SKIP SPRQ QLCH
Stock type: Unrestricted
Second GRqty: 4 K
Inspection lot created: status:No Inspection lot aassigned
Stock type: Quality
I am now able to release this qty from quality in absence of inspection lot.
The inspection plan has DMR.
This issue is exactly similar to following threads, but so far there has not been any resolution to them as well.
http://scn.sap.com/thread/3236065
http://scn.sap.com/thread/3236749
Please advice.
Regards,
Vivek
1.Check if any Quality info record is set.>>"No Inspection "
2.Check if any "Vendor QM system with Skip " is active for material.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Sujit,
I am not using Quality info record. and the Vendor QM system is also not being used. I am simply using the DMR with skips and automatic UD.
The scenario issimilar to the thread posted by Satya. One more observation is that the problem is persisting only in the production system. If I am trying to simulate the same in quality system every thing is working as expected. But I am not able to figure out the cause of this issue.
Regards,
Vivek
User | Count |
---|---|
89 | |
7 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.