cancel
Showing results for 
Search instead for 
Did you mean: 

pr is not generating

mithu_mukhejee
Participant
0 Kudos

Hi ,

In a single sales order in 1st line item,confirming 5 quantities with item category TAN & schdl cat - CP.

2nd line item is having 3 qunatities,which has not been confirmed yet & TAS & schdl cat - CS ,but not generating PR.

Kindly suggest some  solutions.

Thanks in advance

Mithu

Accepted Solutions (1)

Accepted Solutions (1)

bsivasankarreddy_reddy
Active Contributor
0 Kudos

hi

check the CS  Details

Order type            NB    Purchase requisition

Item category         5     Third-party

Acct.assig.cat.       Y     ThirdParty Sales

PR not generate at VA01 level, its generate once sale order is  save , then you check the PR number at VA02 schedule line tab ,

Answers (1)

Answers (1)

former_member184065
Active Contributor
0 Kudos

Hi ,

First line Item and Second Line items were Same or not like below,

10 Line Item - Material A -10 Quantity ( Item Category TAN and Schedule Line Category CP).

20 Line Item - Material A -20 Quantity ( Item Category TAS and Schedule Line Category CS).

Then , the  "Item Category Group"(NORM) in assignments also Same.

Side Comments: Consider Sankar Post also

If you have any doubts please let me know.

Thanks,

Naren

mithu_mukhejee
Participant
0 Kudos

Hi Naren,

Thanks.. i have done these things earlier from last thread where u suggested to do so.

now its all correct.

..

former_member182378
Active Contributor
0 Kudos

Mithu,

Could you please give details as to what was the issue?

When you save the sales order, then the PR is populated. Please confirm this point.

General Note: When you are facing an issue look in to "reference documents". In this case find a sales order, which is a third party order.

Go to SE16N, table VBAP, give item category = TAS and execute.

Then compare the information in that order with the order you are creating.

This reference concept can be used to

- compare document types with the document types you have configured (e.g. for schedule line category - compare CS with the schedule line category you are using VOV6) ,

- compare standard configuration with the configuration you have done.

Side comment - This was proposed by Narendra too

Message was edited by: T W

mithu_mukhejee
Participant
0 Kudos

Hi TW,

Nice to get your advice !!:)

The thread has been already answered.

And Thank u for all suggestions to You & Naren.

Even I too follow that comparison Track (std with the normal changes).

But sometimes a little thing make me so confused.:)

bsivasankarreddy_reddy
Active Contributor
0 Kudos

hi

good kept it up