cancel
Showing results for 
Search instead for 
Did you mean: 

IDM sync from ABAP to IDM

Diggeshhjoshi
Contributor
0 Kudos

If your systems are linked to an IDM system. Does a change in ABAP system ( for example change in valid to date) flow back to the IDM system ?

Thanks,

Digesh

Accepted Solutions (1)

Accepted Solutions (1)

former_member2987
Active Contributor
0 Kudos

If you absolutely have to, a reconciliation task can be created to read changed entries in the SAP system based on changenumber or timestamp.  However best practice, as Christopher mentions above, is to have all changes start from IDM.

Regards,

Matt

Diggeshhjoshi
Contributor
0 Kudos

Hi Matt,

I see reconciliation job exist for Java system only.  How to create job for ABAP system?

Thanks,
Digesh

Answers (1)

Answers (1)

ChrisPS
Contributor
0 Kudos

Hello Digesh,

                  the concept of IDM is that all changes like validity should be done from the IDM

system and that change updated to the connected abap system rather than the other way around.

In answer to the question there would be no automatic update to the IDM system in such a case.

Thanks

Chris