on 10-12-2012 7:20 AM
Hai Everyone,
I have assigned DMR in plan with dynamic modification level as dynamic modification at lot creation. In DMR, I selected dynamic modification for UD. My Sample scenario as follows,
Stage 1 – 3 lots ok then next stage is – skip (skip allowed for 5 ok lots)
In skip stage if 2 lots get rejected then next stage will be stage 1.
In the above case, at the same time, I in warded 5 lots, initially all the 5 lots are in stage 1 only.
After I cleared 3 lots with UD valuation accepted. Then what is the status of 4 Th lot??
As per my understanding, I expected that 4 Th lot inspection stage need to change automatically to skip level. But it’s not changed automatically.The status changed to skip,When I reassigned the inspection tasklist for lot.
Please give some guidelines…
Hi,
the dynamic modification for inspection lot will happen as per the UD of the last inspection lot.
When you created five inspection lots, none of the previous inspection lot has UD as accpeted or rejected, that is why, all the inspection lots were set as stage 1.
Once you had given UD the latest inspection lot as accepted, in that case only, the afterward generated lots will have status as "SKIP'. And the inspection lots generated prior to UD will continue in the same status.
Regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for your prompt reply.
At the same time whatever the number of lots received for the same material. That has same quality level only. After wards there is no stage change occurred for these lots based latest lots cleared among these.
whether my understanding point of view is correct? Can you please explain??
User | Count |
---|---|
95 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.