on 10-01-2012 2:44 PM
Simulation Report: How to get report out of simulation mode. Not planning version reports. |
Penalty cost possible in PPDS?: We want more lower cost when we go up the strength (specific Material #s) and higher cost when we go down the strength (specific Materials #s) . This means that we want PPDS to propose a schedule to go up the strength |
Demand and campaign balance: Consider Mothly demand and still campaigining? How do we make sure that optimizer meets demand and sacrifices campaigning then only. |
Hi Mithun,
Since the description of query is not explicit, I am not clear on your requirements. Anyways, please check the following links for required details around asked topics.
1. Simulation reports: You can try the plan monitor (t.code /SAPAPO/PMON) as well as planning evaluations to report on the planning situation.
Plan monitor: http://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/76/24563907fde825e10000000a11402f/frameset.htm
Evaluation: http://help.sap.com/saphelp_SCM700_ehp02/helpdata/en/0c/53973910a9bc12e10000000a114084/frameset.htm
2. Penalty Costs: PP/DS does not support product specific penalty costs similar to SNP. However, you can use mode costs to achieve your requirements in an indirect way.
http://help.sap.com/saphelp_em70/helpdata/en/b5/236f39ff1ee32ce10000000a114084/frameset.htm
3. Campaign planning: The following link describes dissolving or retaining or extending campaigns based on demand.
http://help.sap.com/saphelp_em70/helpdata/en/cd/2a673b19f27654e10000000a114084/frameset.htm
Thanks,
Rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.