Hi all,
I'm working on SRM 5.0 with the extended classic scenario and i'm trying to distribute a GOA to the back end system without any BADI activation either in SRM or in ECC.
I made all the step of "Strategic Sourcing:Configuration Guide" but neither RFC queue on SRM neither idoc on ECC are created.
In the transaction BBP_CTR_MON ('Monitor Contract Distribution') (sap note 646903) I have seen that there is an error for my GOA with description "Connection Problem" and the field "Backend system" is blank.
Can someone help me.
Thousands thanks.
Bye.
Hi
Is the release purch. org in Distribution belong to backend System?
Best regards
Ramki
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If you have done all the settings in sourcing config guide, then it should work. Have recently done the settings and found that it's a good doc.
Are you sure you configured the ALE settings in R/3 and SRM correctly ?
Also hope you do have some backend p.org setup in PPOMA_BBP.
Best regards
Ramki
Hi Ramakrishna,
1. I am trying to integrate SRM 5.0 with ECC 6.0.
I could able to configure SMOEAC and but when i try to run the R3AS i can see the DNL_CUST_BASIS1, PROD0,PROD1,SRV_MASTER all showing as wait status but not in running status. I had checked the RFC destination i can able to see the R/3 screen from the SRM connectivity is perfect.
Can you please suggest me what could be the reason for going into the wait status .
2. If i want to use existing IDES org structure which have already all the data in place but i can see the problem with BP symbol not displaying (folder symbol displaying) in PPOSA_BBP. and when i try to assign the user thru Users_gen i can see an error saying Action cancelled. Please suggest me what do i need to do.
Thanks,
prasad