Hello Friends,
I have configured SRM 7.0 Ehp1 with ECC 6.0 Ehp5 and PI 7.1. We have Standalone SUS scenario. End to End Config is done. Vendor is replicated from ECC with the Classification Information via PI to SUS. Now we are in the process of replicating the POs to SUS for these vendors.
Here I get an error and stuck since a couple of days.
With Ehp5, PO is sent to SUS via Enterprise Services not Idocs. I have done the configs for BUS2012 and maintained Created and Changed event linkages. The function modules are maintained along with the event linkages.
The respective BADI for the same is implemented.
All the Swtiches are active and in Yellow Status. Worflow gets trigerred after PO Save.
Job finishes successfully in SM37.
But then there's in error in the workflow.
The error is in the execute method of class cl_wf_se_pur_out.
I have implemented the BADI "PUR_SE_PO_INTERFACE_OUT_SELECT".
Still I am not able to generate the XML in SXMB_MONI in ECC.
Any pointers regarding this issue will be of great help.
Thanks
Please activate the implementation of BADI "PURORD_RAISE_EVENT_SE" and check.
With Regards,
Malay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello !
Is the problem is that you get "Feedback after error" in SWEL ? If so, check the transaction SWEC whether any change document EINKBELEG is configured against the business object FREBUS2012 with the event CREATED.
If so, delete it. You won't get feedback after error.
If the problem is that the workflow WS53800008 have run into error, please share its graphical workflow log and binding screen.
Regards,
S.Suresh.
Thanks Suresh. But I am able to see the XML in SXMB_MONI now. There was an issue in the binding in this standard template. I had configured the scenario Plan_Driven_Procurement_SupplierEnablement in PI for this. Supplier already transferred to SUS with this. PO XML gets stucked in ECC with
HTTP_RESP_STATUS_CODE_NOT_OK
401 (Unauthorized).
Also it is picking the interface as shown below;
<SAP:Interface
namespace="http://sap.com/xi/APPL/Global2">PurchaseOrderCreatedInformation_Out</SAP:Interface>
</SAP:Sender>
I saw some postings where people have suggested to use SE_Sourcing_Enhancements. But this scenario is not meant Plan Driven Procurement with Supplier Collaboration.
Any Pointers towards this issue will be really helpful.
Thanks
Hi srm7expert,
This is quite common PI-ECC HTTP error. I would check the roles/authorizations of the user what is used to connect PI into other SAP systems like ECC. User for this connection in SM59 should have at least role SAP_XI_APPL_SERV_USER (additional application-specific authorizations also required).
Also another issue might be that check the passwords so that those are the same for that user in PI and ECC. I'm not sure if this is the case or if this was related to note 1023437 but it helped me when I had a similar HTTP 401 problem.
Another thread what might help you is http://scn.sap.com/people/vijaya.kumari2/blog/2006/01/26/how-do-you-activate-abap-proxies
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.