on 09-26-2012 6:06 AM
Hi experts,
Im just new in QM, i have production order qtyas 1200 pcs, we have operation 10 with in-process inspection, assigned MIC
but our requirement, they want to check every 100 pcs for 1 inspection, so we need to inspection record for 12 times for that operation to completed
12 x 100 = 1200 pcs
how we can map this into sap qm?
regards,
sankaran
hi,
When u assigned inpsection point at operation header in the master receipe or routing then system wll ask u that inspection poit referrence w.r.t time or Qty. assigned the qty. over there.
System will give you the inspection point for every mentioned qty.
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For this scenario you need to assign Inspection Type 03 in Material Master.
In Routing maintain Inspection Point as 150 &
In Operation Details: Under Quality Management Inspection Points -> Mark Qty. related & fill 100 pcs.
Maintain this details & create the Production order say 1000
so system creates lots with interval of 100 qty.
Please check this scenario in Devl.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.