on 09-23-2012 3:57 PM
Greetings to all.
I'm currently taking up the BPI-1 exercises, and i'm having difficulties at creating a delivery note for sales order(exercise 146). When I try to input the storage locations for each item, it always ends up giving me error that "Only 0 EA of material XXX available", to be specific its the Click Pens(CPEN). I tried researching for a solution in the forums but I ended up getting no answers. But looking for the main problem, in checking item availability overview through VA02, checking each line item for its availability, I saw that the item CPEN has no stock but it has stocks in my storage location. What I see is MRP Element : Stock ; Rec./reqd qty : 0, but in my storage location MRP Element : SlocSt ; Rec./reqd qty : 500. But when I checked the other items, it shows that the Stock element has rec./reqd qry equal to rec./reqd qty of the SlocSt Element.
I hope for answers by tomorrow because I really need to finish this set of exercises ASAP.
Thank you in advance,
Enrico
NOTE: I have uploaded pictures for visual aid.
HI Enrico,
Please check the following :
in MD04 for the material & Plant combination check if you SO/Delivery is appears and stock is getting allocated to the requirement and note the date, you will be able to create/PGI delivery only @ that date.
Alternatively, check in SO - for the material in question has a confirmed Schedule line. If not then , it means your stock is not getting considered in the ATP check.
Move your stock to the Sloc that is considered under ATP or enable your SLOC for ATP>
Hope this helps.
Thx
MJ
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In MD04, it seems that the safety stock available qty is 0. I checked my other materials, the difference is that they have available qty in safety stock. How do i fix this? I checked the material details from the material master and under the storoge loc., it shows that it has 500 materials of unrestricted use.
Thank you for the immediate replies.
Enrico
Hi Enrico,
You got 3 option:
1. Add more stock either via the PO-->GR process.
2. If this is test system and you have necessary Authorization, add stock via MB1C mvt type 561- initial stock upload for another 500.
3. If this is test system, change the Material Master in MM02 for the Material/Plant Safety stock =0 , PGI your delivery and then put back the safety stock to 500.
Hope this helps.
Thx
MJ
dear,
you would check out the availability using the t-code CO09
regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.