Hi Team,

My client want to have the scenario as below

The FG material will have a 3 Operations

a) First operation will be done at Inhouse in US and creates material SFG1 by consuming ROH

b) Second Operation will be done at Malaysia at contract Manufacturer and creates - SFG2 by consuming SFG1

c) The Material will be moved to Indonesia for final Operation to Make it to FG material by consuming SFG2

As client want to transfer the SFG1 and SFG2 in bulk by STO and want to have the track of the stock in transit.

At Malaysia and Indonesia the SFG1 and SFG2 need to be consumed from the stock exist at plant sloc.

I thought to go by Plant as Vendor concept for Malaysia and Indonesia.

Please advice for process mapping for the requirement.

Regards

Eshwar H

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

This is ideal case fr subcontracting.