on 09-20-2012 4:57 AM
how to create inspection point when we use qm with pp.i am assigning inspection points to some operations.during confirmation whether i had to do operation wise confirmation or can i do order confirmation.if i done order confirmation if at any operation the material is rejected what is th
hi,
During the in-process inspection , u need to create the sampling procedure w.r.t freely defined inspection point, need to maintained the inspection at routing or master receipe header, and use proper control key. now if u want confrimation of prdn qty. via QM then put yield or scarp during lot closure other wise go through PP order confirmation.
regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Venkateswararao,
Please check the below given steps, first one will help in creating the Inspection points and second one will help in confirmation process with inspection points and its operations.
Inspection point creation:
1) http://help.sap.com/saphelp_46c/helpdata/en/b5/c4db38a91b11d1bd610000e829fdb3/content.htm
Recording the Inspection point confirmation:
2) http://help.sap.com/saphelp_46c/helpdata/en/18/4386c0449011d189420000e829fbbd/content.htm
Please check and revert back.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.