on 09-14-2012 7:22 AM
Hi guys,
I have a scenario to do auto UD to the inspection lot based on the material, production date, production line.
Find the attachment I am giving couple of example with expected output , Please let me know the procedure i need to follow,
Right now, I am using the QA10 standard program Because I, also need to check the inspection lots results recorded and the validation =5
which is done by the standard SAP QA10 program.
The thing I, need to know is to find the open notifications of the Inspection lot based on material , production date, and production line and assign a auto U.D.
But, if the inspection lot as no open notification(NOCO) with the same material , production date and production line which has an open notification it should not Assign to U.D (_HOW TO CHECK THIS LOGIC)
Thank you
Can not be solved by std ways
May be you can check exit QEVA0010 UD: Usage decision check which I think should work when you have logic like
1.Status of lot sgould be RREC or status of all MICs in result recording should be "5"
2.Thers is no notificaion in past is still in process
3.there is no notificaiton pending for this material pastdated etc.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.